Network Rail Domestic Assessment Programme |
|
The inspection brief required a close touching inspection of all inspectable parts of the structure to be carried out. This was achieved by erecting a tower scaffold to the floating platform and manoeuvring it around the structure. |
|
Working for Pakman Consulting Engineers, Tamtara provided a stable floating platform for the inspection for assessment of four rail over river bridges in Wiltshire. |
|
This solution required no track possession to carry out the inspection, resulting in significant cost savings over alternative methods. |